KIngston, Sure Charge, TfL, GULCS, Lamp post charger, City EV, FM Conway

Lighting up London with Lamp Post EV Charge Points

Joju Charging has won the contract under the TfL GULCS framework (Go Ultra Low City Scheme) with the Royal Borough of Kingston, to provide 100 street light charge points for local Kingston residents. The charge points will be installed on existing lamp posts during February and March and will help people make the switch to EV, as residents without access to off street parking will soon be able to park on the street near their homes, plug their electric vehicle into a charge point on a street light and charge away!

READ MORE

Solar And Storage LIVE, Contractor of the Year, 2020, Winner, Award

Joju Solar does the Double

Joju Solar has won ‘Contractor of the Year’ at the prestigious Solar & Storage LIVE awards, to add to the ‘EV Charge point Contractor of the Year’ title secured at the EVIEs last month.

The winners were announced on Friday, at the close of a three-day online conference and the awards now put Joju at the top of the pile across all their product offerings – solar PV, battery storage and EV charging infrastructure.

“Winning the Solar & Storage LIVE Contractor of the Year has been a long-held ambition and it feels amazing”, said Joju Solar Co-founder and Technical Director, Dr Chris Jardine.

“We’ve been working in the low carbon technology space for 14 years and this recognition is testament to the hard work put in by our team over that entire period – continually improving both technically and in terms of the service we offer.”

Joju Solar were recognised for their work on helping hundreds of homes reduce their carbon footprint, through solar, storage and EV charging.  Additionally, it has been an intensive year delivering community energy projects.  We installed 2MW of solar PV for Egni Coop in Wales, including the largest solar roof in Wales, at Newport’s Geraint Thomas Velodrome.  This project won the Community Energy Award at the Solar and Storage LIVE awards in its own right.  Other highlights in 2020 include a 39kW community-owned solar PV array on the roof of Salisbury Cathedral.

Joju is also working with more than 80 councils nationwide to install EV charge point infrastructure, simplifying the process and allowing councils to deploy charging infrastructure across their region without spending a penny.

“It’s very pleasing to be recognised across all our product offerings as offering excellent service in what we do.” said Chris.  “But this is still very much the beginning – the climate crisis hasn’t gone away; we still need lots more renewable capacity; and a complete electric transport revolution needs to happen in the next decade.  That’s always been our mission”